East Portland Pool - a LEED Platinum addition to an existing community center
I was the City project manager on this ten-year long project, bridging two mayors, three commissioners, two Parks directors and the introduction of LEED. The East Portland Community Center completed in 1998, lacked a much-desired swimming pool. The proposal drawing I prepared in 1998, in response, was remarkably similar to the final plan shown below. This is believed to be the first LEED Platinum swimming pool complex in the US. [In conjunction with SERA Architects, Water Technology, and a complex team of engineers in order to achieve LEED Platinum. Constructed by Lease Crutcher Lewis and The Pool Company.]